Tasmanian Hydro Electricity & Power Station Explorer – Closed due to Covid-19

$65.00

Trevallyn hydroelectric power station is located 5 minutes from the heart of Launceston and was commissioned in 1955.

It houses 4 generators of around 25MW capacity each and supplies around 4% of Tasmania’s installed generating capacity.

Itinerary
This is a typical itinerary for this product

Stop At: Lake Trevallyn Road Launceston Tasmania 7250 Australia

Trevallyn power station was commissioned in 1955 and took over from the Duck Reach power station that started operation in December 1895. Duck Reach power station was the first publicly owned generating electricity plant in the Southern Hemisphere

Duration: 1 hour 30 minutes

Trevallyn hydroelectric power station is located 5 minutes from the heart of Launceston and was commissioned in 1955.

It houses 4 generators of around 25MW capacity each and supplies around 4% of Tasmania’s installed generating capacity.

Additional information

Duration

1 hour 30 minutes

Commences

Trevallyn Australia

Region

Tasmania

City

Trevallyn

Category

Cultural & Theme Tours